Technical CMC is estimated at 31.0% of CMC grade demand in 2026, with copper-nickel ores at 25.0% and gangue depression at 32.0%. Mine-site trials tie reagent selection to recovery and concentrate grade because variable mineralogy and process-water chemistry slow grade changes.